D3 Private Office
This project was done in December 2016
Client: Private
Location: Dubai Design District, building 7
The main problem of the floor installation at this project was in the raised flooring, on top of which we should have installed our micro topping system to provide a look of raw polished concrete finish to the office reception. To protect our coating from every possible movement and to seal all the visible joints in the raised floor tiles, our experts applied a fiberglass mesh glued with a clear epoxy compound prior to the main system coating. After full epoxy curing, the main microtopping system was installed with extra coats of primer and base cementitious overlay, and then sealed with matt polyurethane sealer.